
PCB Fabrication / Quick-Turn
When time-to-market is everything. Dedicated fast-track production line, pre-stocked FR-4 laminates, same-day DFM review, and express global shipping. 100% AOI and E-test included on every rush order.
Turnaround Speeds
| Tier | Turnaround | Layer Count | Materials | Trace/Space | Finishes |
|---|---|---|---|---|---|
| Super Rush | 24 hours | 2-8 layers | FR-4, 1.6mm | 6/6 mil min | ENIG, HASL |
| Rush | 48 hours | 2-12 layers | FR-4 High-Tg | 4/4 mil min | ENIG, HASL, OSP, Imm Ag |
| Express | 72 hours | 2-16 layers | FR-4 standard | 5/5 mil min | ENIG, HASL |
All quick-turn orders include 100% AOI, flying probe E-test, and same-day DFM review. Submit before 10:00 AM CST for same-day processing.
How We Accelerate
Quick-turn isn't just faster scheduling, it's a separate production cell with dedicated equipment, pre-stocked materials, and a specialized engineering team. Your boards never wait in queue behind standard production orders. The fast-track line runs 24/6 with 3 shifts to ensure continuous throughput.

Design Qualification
DFM & Quality
Speed doesn't mean cutting corners. Every quick-turn order goes through the same rigorous DFM review process, just faster. Our CAM engineers review your Gerber files within 4 hours of submission. If issues are found, you'll receive a marked-up report with specific recommendations before we proceed. Common catches include insufficient annular rings, acid traps, slivers, and solder mask sliver violations.

| Carrier | Service | To North America | To Europe | To Asia-Pacific |
|---|---|---|---|---|
| DHL Express | Priority | 2-3 days | 2-3 days | 1-2 days |
| FedEx IP | International Priority | 2-4 days | 2-4 days | 1-3 days |
| UPS Express | Worldwide Express | 2-3 days | 2-3 days | 1-2 days |
| FedEx IE | International Economy | 4-6 days | 4-6 days | 2-4 days |
All shipments include tracking and insurance. DDP (delivered duty paid) available for most destinations. Full shipping details.
Submit your design before 10:00 AM CST for same-day DFM review and next-day production start. Include your turnaround requirement (24h/48h/72h) in the message.